The lowest of the river crossing of the old railway line.  The works largely took place from the left hand bank. The right hand bank abutment was totally destroyed in the November 2009 flood. The mid-river buttresses were accessible from the left hand bank.  Similarly, platforms were created by the dismantled abutment and buttresses stone and relayed by machine back to the banking.

The timelapse video for the removal works can be seen here

Photo Gallery